Tarmac, a CRH company, is the UK’s leading sustainable building materials and construction solutions business. With over 150 years experience, they operate a national network of more than 400 sites across the UK. As part of CRH, a global leader in building materials, Tarmac is committed to whole-life sustainability, operational efficiency and reducing the carbon footprint of their asphalt production processes to build a positive, lasting legacy.

The Challenge:

At their Barrasford site, Tarmac produces high-quality asphalt for the North East of England and Scotland, supplying both their own surfacing gangs and a wide network of regional customers. Barrasford Asphalt Plant, Section Manager Carl Anderson and his team faced a persistent and costly issue: poor moisture control of their aggregates.

Because their Recycled Asphalt Pavement (RAP) and asphalt sand were left exposed to the elements, moisture content was reaching as high as 8%. This high moisture level had a direct impact on operational efficiency. The plant had to consume excessive amounts of fuel to heat virgin aggregates to compensate for the wet materials. Furthermore, without adequate weather protection, the plant was restricted to a maximum RAP utilisation rate of just 30%. Operating in a quarry known for its high winds, Tarmac needed a heavy-duty storage solution that could withstand severe weather while keeping their materials dry.

The Solution:

To overcome these challenges, Tarmac turned to Zappshelter, choosing our system specifically for its renowned build quality and durability in exposed environments.

They installed seven impressive 14m x 24.5m Zappshelters, mounted side-by-side on precast concrete walling to create segregated storage bays and with integrated guttering and outlet system for effective rainwater management. The structures were tailored specifically to Tarmac’s operational needs. Built with open backs, the Zappshelters allow the wind to flow directly through the bays, facilitating natural drying of the aggregates without costing a penny in energy. 

The generous clearance height of the Zappshelters also ensures that loaders and shovels of various sizes can drive in and out seamlessly, maintaining high site productivity.

 The Result:

The impact of the new Zappshelters was immediate and transformative. By keeping the processed RAP and sand under cover, moisture content plummeted from 8% down to an incredible 1.4%.

This drastic reduction in moisture has led to significant fuel savings, as far less energy is now required to heat the virgin aggregates. The new setup also allows the team to alternate sheds for processing and storing, enabling them to closely monitor the different types of RAP they have on site.

Most impressively, thanks to the Zappshelters and improved processing capabilities, Tarmac has been able to increase their RAP addition rate from 30% to 50% – an outstanding 20% increase that drives both environmental sustainability and cost efficiency.

What Tarmac Says:

“Since we’ve had the Zappshelters installed, we’ve now got the RAP moisture content down to 1.4%. The moisture is being reduced which also helps us save on fuel; it doesn’t mean we have to put as much fuel in to heat the virgin aggregates.


We chose Zappshelter here at Barrasford for the build quality. We’re used to a lot of high winds, and the Zappshelter is withstanding the winds. With the help of the Zappshelters and the processing of the RAP, now we are able to go to 50%, which gives us an additional 20% addition of RAP on this plant.


If someone asked me about Zappshelter and whether they would like to buy one, I would say yes. The quality compared to the competitors is second to none. One sentence I’d use to describe Zappshelter would be strong and reliable to help us cover all materials.”

– Carl Anderson, Section Manager, Barrasford Asphalt Plant